Engineering Technology Team

Team Members

Zack Stotler. Jesus Corral, Justin Duvall, Matt Henderson & Christian Schultz

Advisor:  Dr. David Miller

Countdown:

NaN days, NaN hours, NaN minutes, NaN seconds

HOW WILL YOUR GIFT MAKE AN IMPACT -- Below is a breakdown of materials and all expenses.

Total Budget for Project 

ITEMCATEGORYQUANTITYPRICE OF UNITSHIPPINGTAXTOTAL
16 inch tiresMaterials16$30.85$0.00$44.42$538.02
SeatMaterials4$14.94$0.00$5.38$65.14
shocks (sets of 2)Materials8$12.25$13.99$8.82$106.78
1/2 sqare tubing (6ft long)Materials24$14.66$36.71$31.67$383.51
48in x 96in plastic corrugated pads (set of 10)Materials1$32.20$0.00$2.90$35.10
4" zip ties (pack of 1000)Materials1$20.00$0.00$1.80$21.80
bolts & nuts (box of 100)Materials1$31.85$0.00$2.87$34.72
sqare stock 48 inMaterials1$98.68$0.00$8.88$107.56
Hitch pinsMaterials16$3.30$0.00$4.75$57.55
1/2in aluminum rod stock (6ft long eachMaterials4$36.14$0.00$13.01$157.57
sheet stock 12"x 48"Materials4$32.29$0.00$11.62$140.78
Foam Pool Noodle (5-pack)Materials4$17.49$0.00$6.30$76.26
TIG WIRE 4043 1/16-36IN 1LB TUBETools4$23.99$0.00$8.64$104.60
Emergency Fund / repairsEmergency fund



$500.00
Travel expenses




$500.00
Total Amount of Cash needed for manufacturing




$2,829.37



$


Billing Information

  • Visa
  • Mastercard
  • American Express
  • Discover
GivingFuel Fundraising Software